Location: LG Arena, Birmingham, UK
Project/Case: LG Arena
Year: Completed July 2012
We provided a solution for The NEC Group by installing a roof protection system that prevents heavy ice and snow buildup on the LG Arena’s roof. This ensured the roof could support additional audio visual equipment without needing structural reinforcement. The system included specialist cables tailored for the roof and a fully automated control system for energy-efficient operation, successfully clearing snow during use without issues related to water runoff.
System Specifications:
• 12km of specialist UV stable ice and snow
melting cable
• Proprietary roof fixings and specialist adhesives
• Automatic monitoring and control equipment
including temperature and moisture sensors